Pilot

Electra 00

Our 10t CO2/year pilot process at our facilities in Ismaning, Germany.

ABOUT

Proof of concept

Electra 00 is our pilot plant with a removal capacity of 10 tCO2/year. The pilot operates outside and already uses our commercial-scale Hydrolyzer and absorber technology.

About

Key facts


Launch

Q1 2025


Annual capacity

10 tCO₂/ year


Location

Germany

Leading the pack

This pilot demonstrator demonstrates commercial-scale technology and helps us iterate fast.

01

Outside operations using commercially scaled core components (hydrolyzer, absorber).

02

Electra 00 is powered by on-site solar panels, demonstrating decoupled, load-flexible operations with renewables.

03

Lift Direct Air Capture process to TRL 6.

Other projects