)
Pilot
Electra 00
Our 10t CO2/year pilot process at our facilities in Ismaning, Germany.
)
ABOUT
Proof of concept
Our End-to-End pilot with an initial capacity of 1 tCO2/year is upgraded to a larger 10 tCO2/year pilot. The pilot operates outside and already uses commercial-scale hydrolyzer and absorber technology.
About
Key facts
Launch
2024
Annual capacity
10 tCO₂/ year
Location
Germany
Leading the pack
This pilot demonstrator demonstrates commercial-scale technology and helps us iterate fast.
)
01
Outside operations using commercially scaled core components (hydrolyzer, absorber).
)
02
Demonstrate decoupled, load-flexible operations with renewables.
)
03
Lift Direct Air Capture process to TRL 6.